Process and FAQ

What to expect from the first call to the final certification.

How a project moves

  1. First call

    Send the address or parcel ID and your goals. We talk through the site and what it will take.

  2. Proposal

    A written scope, fee and schedule, so you know what is included before work starts.

  3. Site evaluation and concept

    We confirm zoning, utilities, drainage and floodplain constraints and lay out a concept plan.

  4. Design

    Construction plans and calculations for grading, drainage, stormwater, paving and utilities.

  5. Permitting

    Submittals to the city or county, water management district and FDEP, and responses to every review comment.

  6. Construction and certification

    Shop drawings, contractor questions, site observations and the signed and sealed certifications that close out your permits.

Frequently asked questions

Do you take small residential projects?

Yes. We regularly prepare grading and drainage plans for single lots, additions and pools, and help homeowners with drainage problems.

What do I need to get started?

The property address or parcel ID and a short description of what you want to build. A boundary and topographic survey, geotechnical report and any existing permits or plans help, but we can tell you what is needed if you don't have them yet.

How long does permitting take?

It depends on the jurisdiction, the agencies involved and the size of the project. Your proposal will include a realistic schedule for your specific site.

How are fees set?

Most projects get a written proposal with a defined scope and fee. Hourly rates are used for open-ended work like expert witness services.

Does my project need a stormwater permit?

Many projects that add impervious area or change drainage need a permit from a water management district or FDEP, along with local approval. Thresholds and exemptions vary, so we check this during the preliminary site evaluation.

Can you inspect and certify our existing stormwater pond?

Yes. We perform operation and maintenance inspections and prepare the Form 62-330.311(1) certification required under Rule 62-330.311, F.A.C.

Do you work as an expert witness?

Yes, on matters involving stormwater, flooding and drainage. Contact us with the case details to check for conflicts first.

Tell us about your site.

Email a parcel ID or address and a few lines about the project. We'll set up a call.